Site
Preparation For Esh Buildings:
•
Esh's recommends a gravel pad or foundation
for placement of buildings.
• Use a 2-B gravel, crusher
run or modified stone
• Make sure the site is level!
• Use a transit or line level
• Prepare the site 2 feet wider and 2 feet longer than
the structure ordered.
• Make sure there are no grades greater than 22% - truck
and trailer have a 9'
clearance.
• Check for power lines, tree limbs, etc.
• The combined length of truck and trailer is 52 feet.
Please take this size into
consideration.
• We are not responsible for crossing over water and/or
septic lines!
|